Individual EA measurements
Largest measured bleak
The largest individual measurements in this river and species dataset. Equal measurements are retained as separate surveyed fish.
| Length | Survey date | Survey location | Survey ID |
|---|---|---|---|
| 18.3 cm | 27 Jul 1989 | Nassington | 54047 |
| 16.3 cm | 30 May 2008 | Stanground Back Channel | 111333 |
| 16.3 cm | 25 Sept 1989 | Stibbington | 54050 |
| 16.3 cm | 27 Jul 1989 | Nassington | 54047 |
| 16.3 cm | 27 Jul 1989 | Nassington | 54047 |
| 16.3 cm | 27 Jul 1989 | Nassington | 54047 |
| 16 cm | 21 Sept 1993 | Cogenhoe Back Channel | 54057 |
| 16 cm | 15 Sept 1989 | Stanground Back Channel | 54055 |
| 16 cm | 22 Jun 1989 | Downstream Clifford Hill lock | 54005 |
| 15.9 cm | 12 Jul 2007 | Downstream Clifford Hill lock | 106489 |
Lengths are direct survey measurements. RiverFish does not estimate fish weights from length.
Explore the river
Where bleak were found
Each point marks a survey location with at least one bleak record.
Choose a point on the map to see what was recorded there.
Map points are approximate and don’t show fishing access. Check local permissions before visiting.
| Place surveyed | First recorded | Last recorded | Visits finding bleak |
|---|---|---|---|
| Castor Mill Channel | 12 Oct 2009 | 18 Sept 2018 | 4 |
| Yarwell Mill Back Channel | 9 Sept 1981 | 17 Sept 2018 | 16 |
| Barnwell Back Channel DS Oundle Mill | 14 Sept 2018 | 14 Sept 2018 | 1 |
| Wansford Lock Back Channel | 13 Sept 2018 | 13 Sept 2018 | 1 |
| Thrapston | 3 Jul 1995 | 25 Jun 2015 | 10 |
| Downstream Wansford Lock | 19 Jul 1989 | 22 Jun 2015 | 12 |
| Upstream Earl's Barton Lock | 25 Oct 2013 | 25 Oct 2013 | 1 |
| Wadenhoe Backchannel | 21 Sept 2009 | 16 Oct 2013 | 2 |
| Upstream Ditchford Lock | 26 Sept 2013 | 26 Sept 2013 | 1 |
| Ringstead Back Channel | 13 Sept 2012 | 13 Sept 2012 | 1 |
| Downstream Clifford Hill lock | 22 Jun 1989 | 12 Sept 2012 | 10 |
| Cogenhoe Main Channel | 6 Sept 1995 | 11 Sept 2012 | 9 |
| Downstream Oundle North Road Bridge | 20 Jul 1989 | 5 Sept 2012 | 10 |
| Downstream Wadenhoe Lock | 9 Oct 1989 | 30 Aug 2012 | 5 |
| Downstream Hardwater Lock | 15 Jul 2009 | 23 Aug 2012 | 3 |
| Ferry Meadows | 3 Jul 1984 | 17 Aug 2012 | 8 |
| Downstream Fotheringhay | 19 Jun 1984 | 3 Aug 2012 | 11 |
| Downstream Irthlinborough | 23 Jun 2005 | 30 Jun 2010 | 5 |
| Stanground Back Channel | 15 Sept 1989 | 21 Jun 2010 | 11 |
| Ailsworth | 4 Aug 1989 | 16 Jun 2010 | 10 |
| Barnwell Back Channel | 21 Sept 2001 | 7 Jun 2010 | 8 |
| Eaglethorpe Backchannel | 27 Oct 2009 | 27 Oct 2009 | 1 |
| Irthlingborough Backchannel | 18 Sept 2009 | 18 Sept 2009 | 1 |
| Ailsworth Upstream of BC weir | 12 Aug 2009 | 12 Aug 2009 | 1 |
| Wellingborough Back Channel | 19 Aug 2003 | 9 Jun 2009 | 7 |
| A47 Wansford | 8 Jul 2008 | 8 Jul 2008 | 1 |
| Upstream Elton Road Bridge | 14 Jul 1989 | 7 Jul 2008 | 2 |
| Stibbington | 25 Sept 1989 | 4 Jul 2008 | 3 |
| Cogenhoe Back Channel | 10 May 1989 | 11 Jun 2008 | 7 |
| Yarwell M/C | 22 Jun 1984 | 22 Jun 2006 | 8 |
| Upstream Wellingborough | 10 Aug 1995 | 27 Jun 2005 | 5 |
| Billing Aquadrome | 4 Oct 1995 | 4 Oct 1995 | 1 |
| Upstream White Mills | 10 Sept 1995 | 10 Sept 1995 | 1 |
| Hardwater Back Channel | 8 Sept 1995 | 8 Sept 1995 | 1 |
| Downstream White Mills | 4 Sept 1995 | 4 Sept 1995 | 1 |
| Upstream Hardwater Lock | 24 Aug 1995 | 24 Aug 1995 | 1 |
| Upstream Wollaston Lock | 24 May 1989 | 23 Aug 1995 | 2 |
| Ditchford Back Channel | 15 Aug 1995 | 15 Aug 1995 | 1 |
| Downstream Upper Ringstead | 1 Aug 1995 | 1 Aug 1995 | 1 |
| Thorpe Channel | 3 Oct 1989 | 17 Jul 1995 | 2 |
| Nassington Back Channel | 11 Jul 1995 | 11 Jul 1995 | 1 |
| Lilford Park | 10 Oct 1989 | 10 Jul 1995 | 2 |
| Upstream Lower Barnwell Lock | 26 Jun 1995 | 26 Jun 1995 | 1 |
| Downstream Cotterstock | 21 Jul 1989 | 21 Jun 1995 | 3 |
| Upstream Elton Lock | 20 Jun 1995 | 20 Jun 1995 | 1 |
| Upstream Fotheringhay | 26 Jul 1993 | 9 Jun 1995 | 2 |
| Bedford Gravels | 8 Aug 1989 | 25 May 1995 | 3 |
| Lilford Upstream | 4 Oct 1989 | 4 Oct 1989 | 1 |
| Aldwincle Channel | 2 Oct 1989 | 2 Oct 1989 | 1 |
| Peterborough Embankment | 14 Sept 1989 | 14 Sept 1989 | 1 |
| Upstream Milton Ferry | 1 Aug 1989 | 1 Aug 1989 | 1 |
| Nassington | 27 Jul 1989 | 27 Jul 1989 | 1 |
| Denford Upstream Lock | 26 Jul 1989 | 26 Jul 1989 | 1 |
| Wellingborough Embankment | 12 May 1989 | 12 May 1989 | 1 |
| Downstream Rushmills | 7 Apr 1989 | 7 Apr 1989 | 1 |
Choose a point or table row to see the location. More survey visits can mean more records, but not necessarily more fish.
1981–2018
Survey records by year
Each bar shows how many survey visits recorded bleak that year.
Fish measured by surveyors
Measured length distribution
See how the 8,864 measured fish were spread across different length ranges.
- Smallest
- 1 cm
- Lower quarter
- 8.4 cm
- Median
- 9.2 cm
- Upper quarter
- 10.5 cm
- Largest
- 18.3 cm
Lengths are direct survey measurements rather than anglers’ catches.
More fish in this river
Explore the River Nene
Compare other species with enough survey and measurement data for a detailed page.
Before you fish
Good to know
These are past survey records, so the fish present today may be different. Map points are approximate—check local access, permissions and fishing rules before visiting.
Learn how RiverFish uses the data →